Temple progress
A record of the work at Bargi, newest first. The trust posts here whenever a stage begins or ends, with photographs from the site.
-
Next
Walls of the Sreekovil and the mandapa
Work resumes once the materials for the walls are funded. ₹2.9 lakh of ₹58 lakh has been received so far.
Sponsor materials -
Aug 2025
Plinth
Foundation completed
The stone foundation and plinth of the temple are now complete. Further work is waiting on funds for materials.
-
Jul 2025
Stone masonry
Stone masonry foundation rises
Granite stone masonry was built up from the concrete bed to form the foundation walls.
-
Jul 2025
PCC bed
Concrete bed laid for the sanctum
A plain cement concrete bed was laid at the base of the excavation to receive the stone foundation.
-
Jun 2025
Excavation
Excavation for the foundation
Trenches for the foundation were dug by hand along the marked lines.
-
Jun 2025
Site marking
The temple plan is marked out on site
The outline of the Sreekovil, mandapa and surrounding structures was marked on the land at Bargi following the Kerala architectural plan.